engineering case

Lixiang Tongji-specializing in the production of fabricated steel bridges and modular steel bridges


Dingba Steel Bridge Platform of the Haitang Anlan Project in Shangyu District, Shaoxing City

Dingba Steel Bridge Platform of the Haitang Anlan Project in Shangyu District, Shaoxing City

Zhuhai Hengqin Second Bridge

Zhuhai Hengqin Second Bridge

Changping Expressway

Changping Expressway

Yuhuan Xuanmen Phase III Reclamation Project

Yuhuan Xuanmen Phase III Reclamation Project

Phase II expansion of Xiaoshan Airport, 321 cantilever structure.

Phase II expansion of Xiaoshan Airport, 321 cantilever structure.

Guangzhou-Shenzhen Intercity Rail

Guangzhou-Shenzhen Intercity Rail

Shenzhen-Zhongshan Channel

Shenzhen-Zhongshan Channel

Shaoxing North Station Front Project 321 Reinforced Type

Shaoxing North Station Front Project 321 Reinforced Type

Ningbo International Conference Center 321 Cantilevered

Ningbo International Conference Center 321 Cantilevered

Inner Mongolia Chifeng 200 Type Double Lane Three Row Single Layer Reinforced

Inner Mongolia Chifeng 200 Type Double Lane Three Row Single Layer Reinforced

Lhasa 54-meter single-span three-row double-layer reinforced type

Lhasa 54-meter single-span three-row double-layer reinforced type

Kaili 69m 321 type double-row reinforced model

Kaili 69m 321 type double-row reinforced model

ZB200-L130 Prefabricated Highway Steel Bridge Research Project

ZB200-L130 Prefabricated Highway Steel Bridge Research Project

Cixi Hangwan Financial Port

Cixi Hangwan Financial Port

Shaoxing North Station

Shaoxing North Station

Shaoxing Shangyu Haitang Anlan Project

Shaoxing Shangyu Haitang Anlan Project

< 12 > 跳转到